Day 1:
GnG Infomation and Geomechanical Modelling
- Petroleum System
- Geological data (trapping sytem), Exploration and Development of Geology
- Basic of Geomechanical Modelling
- GeoMechanical Modelling Result as base for Drilling Program and Drilling parameter realized in the form of Geological Montage.
Drilling Program, Drilling Paremeter, and Rig Specification
- Driling Program refer to GnG in term of Pore Pressure, Collapse Pressure, Fracture Pressure, Temperature Gradient, and Formation/Reservoir/Lithology Properties.
- Drilling Parameter concern to Lithology or Rock Properties.
- Rig Selections and other equipment required base on Geological Achievement (Interest Zone, and Proposed TD)
Day 2:
Drilling Fluids and Completion Fluids
- Basic of Drilling Fluids (Function of DF, Clay Mineral and Mud Chemistry, Mud Properties : Mechanically and Chemically)
- Water Base Mud and Oil Base Mud (Product and system, WBM and Hig Performance WBM, Oil and Synthetic Base Mud)
- Circulation System, Formation and Hole Problem (Lost Circulation, Stuck Pipe, HPHT Challenges, HPHT applications and systems)
- Drill Care (Hole Cleaning, Virtual Hydraulic and real time measurement, Reservoir Drill in Fluids for Horizontal well, Completion Fluids, Well Clean up and Displacement Procedure)
- Equipment and Future Technologies (Solid Control Equipment, EmergingTechnologies)
Day 3:
Casing and Cementing Program
- Casing Function, Casing Set Strategy related with GnG information, and Casing Acessories
- Casing Category (Conductor or Surface Casing, Intermediate casing, Production casing, Liner hanger)
- Casing Drilling
- Basic Cementing and Function.
- Cementing Procedure (Casing / Liner cementing, Cement Plug, Cement Squize).
- P & A Program
MPD with used RCD and EKD, PMCD with maintain PWD for UBD, Drilling Through Narrow Margin (Depleted Zone, HPHT, and Deep Water well).