Integrated Training

A Comprehensive Overview of Well Intervention, Artificial Lift Design, and Revitalizationof Mature Field

Objective

This Training is designed for engineers and field personnel in production engineering and operations. This integrated training provides a broad overview of all aspects in Well Intervention operations, the most widely used Artificial Li

Systems and overview of Mature Oil Field.

Course Info
Discipline

H. Data Management Course/Data Management

Duration

4 days

Level

Skilled

Delivery Mechanism

In House Training

Deliverables:
Modules
Certificate
E-Learning
Schedule
Agenda

REVITALIZATION OF MATURE FIELD

  1. Overview of Mature Field
  2. Field Production History, How Much
    Remaining Oil and Where?
  3. Reservoir and Operational Problems
  4. Mature Field Revitalization – Technical
  5. Mature Field Revitalization – Economical
  6. Tertiary Recovery: Thermal, Gas, Chemicals
  7. Advantages & Disadvantages of Each
    Revitalization Method
  8. Case Study

 

ARTIFICIAL LIFT DESIGN

  1. Artificial Lift Technology
  2. Fundamentals of Downhole Condition
  3. Production Nodal Analysis
  4. Main Artificial Lift Methods
  5. Methods
  6. Gas Lift Design, Problems & Troubleshooting
  7. ESP Design, Problems & Troubleshooting
  8. Rod Pump Operations, Problems & Troubleshooting
  9. Software Application

 

WELL INTERVENTION OPERATION

  1. Basic Well Construction
  2. Well classification
  3. Various well completion types
  4. Well completion equipment
  5. Well intervention overview
  6. Slickline unit
  7. Electricline and braided line
  8. Coiled tubing
  9. Snubbing unit (overview & optional)
  10. Well intervention unit bleed off line
  11. Well intervention unit points of concern
  12. Well intervention program
  13. Understanding well diagram / well sketch
    (important information in well diagram /
    well sketch
  14. Applicable well intervention program for
    specific well diagram / well sketch
  15. Delta versus offshore operation
  16. Offshore operation
  17. Example of well intervention operation
  18. Well intervention major risks
Instructor

Experienced in well intervention operation management covering engineering, on-site operation supervision, drilling & wells safety methods, personnel recruitment and training, competency development, and well integrity. Extensive exposure to drilling engineering and operations, well completion, well integrity systems including SSV and SSSV, wellhead and Christmas tree valve integrity, production engineering and operations, gas lift and ESP design. Strong focus on Safety, Health, Environment, economic evaluation, cost reduction, production targets, project effectiveness, timely execution, and alignment with company business objectives. Also experienced in tender processes including preparation of technical specifications, project budgeting and financial proposals, scheduling, bid documentation, bid evaluation, bid awarding, and contract agreement management.

In House Training

Start Date:

4 October 2025

End Date:

8 October 2025

Price
IDR 145 Mio
Minimum 7-15 participants